

Zhuankou Water Plant, located in Dianta Village, Zhuankou Street, Wuhan Economic and Technological Development Zone, was established in 1996, covering an area of approximately 127,000 square meters. Drawing water from the Yangtze River, it is one of Wuhan’s key water supply infrastructures. The plant’s initial capacity was 100,000 m³/day. After several expansions, its total water supply capacity has now reached 300,000 m³/day, providing solid water resource support for regional economic and social development.
Throughout the plant’s development, KEDI Intelligent participated in all three expansion projects, providing comprehensive services including electrical equipment, instrumentation, automation system equipment, and installation. deployed a comprehensive production system platform and intelligent dosing system, providing technical support for digital management of production operations, control coordination, and chemical dosing adjustment.















